Within the framework of construction of the Highway Project, several environmental and social studies were undertaken at different phases:

  • The environmental and social  evaluation of the project undertaken by Buursink in 2006 and available in three volumes :

-    Right-of-way
-    Resettlement zone
-    Restructuring the Pikine Irregulier Sud zone

  • The comprehensive environmental study of the impact of the Mbeubeus waste dump on the resettlement area and the characterization of the soil in the resettlement area.   
  • Comprehensive environmental and social study of the highway stretch
  • Environmental and social study of the resettlement area    
  • Monthly reports on the environmental monitoring of the Malick Sy – Patte d’Oie and  Patte d’Oie – Pikine construction works site   


As regards the highway stretch, a certain number of impacts were identified with the various improvement measures for positive impacts and mitigating measures for negative impacts.

Impacts

Improuvement Measures

Construction

Income-generating activities for the local  populations during the works

•    Promote recruitment locally
•    Encourage the employment of local workers (term in the  contract)
•    Encourage the conclusion of contracts with youth associations in neighboring districts  
 

Possibility of new jobs with the firm responsible for the management and maintenance of the highway

• Encourage the use of local SME/EIG by sub-contracting some activities
• Support to SME through training and the facilitation of access to credit

Intensification of economic and commercial activities around the work sites  (catering, etc.)

Develop specific areas and organize the activities around the  site in the course of the works

Operation

The road’s good standard of service

Ensure the routine and periodic maintenance of road infrastructure

Opening up the areas crossed  
Increase the public transport offer potentials
Facilitation of access to urban infrastructure (hospitals, administrative centres)
Promote the creation of new bus routes (DDD)
Create a road network and transportation systems suited to the concerned areas

Environmental protection notably environmental health

•   Improving the security of goods and persons; Improving the living conditions of the populations, notably by restructuring the zone
•   Set up effective household waste management systems
 

Improving public health and socioeducational activities

•    Improved access to internal and external health structures through restructuring
•    Rapid transportation of rescue facilities in case of disaster
•    Improved access to education and training structures

  Global negative impact mitigation measures

Tableau 15  PGE summary table


Activities

Sources
Negative
Impacts 
Mitigating
Measures

Evacuation of right-of-ways
 

• Tree cutting  
• Acquisition of land
• Marking out the works
• Mechanized site preparation works
 
Demolition of houses Indemnification/compensation
Displacement of the populations Relocation in the resettlement area 
Loss of activities and sources of income • Indemnification/compensation
• Site layout  
 

• Reduction of the plant cover
• Soil erosion
 
• Compliance with routing
• Involvement of forestry services
• Reinforcement planting
• Tree cutting expenditures
 

• Disruption of habits and customs
• Disruption of riparian activities
 

• Information and sensitization
• Social support
 
Disruption of water injection Maintain water drainage

Solid waste  and demolition debris disposal

Evacuation of solid waste and debris towards authorized sites

• Separation of  communities
• Traffic disruption
 

• Information and sensitization
• Temporary  traffic structures
• Signalling, lanes, foot bridge
• Organization of the traffic by the Police
 

Disruption of the network of operators 

• Coordination with concerned services
• Informing the populations
• Immediate rehabilitation of networks  
 

Mbao classified forest
 

• Destruction of plant cover, of wildlife habitat
• Disruption of economic activities
 

• Indemnification/compensation
• IREF consultation/involvement in the monitoring
• Integrated development of remaining parties

Installation and commissioning of the domestic site 

Occupation of forest  zones  (FC Mbao)

Deforestation  and education of the plant cover

• Involvement of forestry services
• Reinforcement planting
Clearing  after the works
 

Spilling oils and waste water
Solid waste disposal
 

Soil and water contamination 

•  Collecting and recycling used oils
•  Collection and evacuation solid waste
Appropriate health facilities
 

Occupation of private or agricultural land

• Social conflicts
• Crop or farmland loss
 

• Choice of  sites in relation with owners or local authorities
• Clearing of sites after use
 

Poor staff protection

• Discomfort /nuisances caused by noise, dust and gas
• Industrial accident
 

• Head of Health and Safety (HSE)
• Protection equipment
• First Aid kit
• Staff sensitization  
 

Poor site signposting

Collusion of construction machines with other users

Signposting and sensitization

Site withdrawal

Social conflicts with populations

• Site clean-up
• Transfer  of facilities
 

Recruitment of site staff

Presence of foreign labourers

Conflicts  with local  populations

• Give priority to local recruitment  
• Give special weight to the HIMO approach
 

Poaching in the Mbao forest

• Sensitizing the site staff
• Surveillance by the forestry services
 

Propagation of STI/AIDS

• Sensitization (staff /population)
• Distribution of preservatives (site)
 

Installation of bituminous mixing  and crushing plants

• Occupation of agricultural /forest zones
• Noise, gas and dust  emission  
• Liquid and oil spills
• Closeness to the residential areas
 

• Reduction of the plant cover
• Destruction of  wildlife habitat  (Mbao classified forest)
 

•  Judicious selection of establishment site
•  Involvement of forestry services
Reinforcement planting

Reduction of cultivable areas 

• Judicious and authorized selection of sites
• Cleaning of sites after works
 

• Air pollution
• Respiratory diseases
 

• Judicious selection of establishment site
• Staff protection
Sensitization of neighbouring populations
 

Soil and water contamination

Oil protection and collection mechanism (see environmental clauses)

Opening up and using right-of-way areas and quarries

Deforestation

• Reduction of the plant cover
• Erosions of exposed soils
 

Operating quarries and borrowings  authorized
Poor signposting Risks of accidents Signposting and sensitization

Dust emissions

Respiratory diseases

• Staff protection
• Regular watering of manifold (grinding station)
 

Occupation of private or agricultural sites

• Deterioration of agricultural land
• Social conflicts
 

• Operating quarries and borrowings authorized
• Prior consent of beneficiaries
• Rehabilitation after the works
 

Road network and deviations

Destruction of plants and farming zones

• Reduction of the plant cover
• Reduction of cultivable areas
 

• Judicious selection of routing
• Cleaning of sites after works
 

Digging and shaping the platform

Excavation
Coating  

Civil engineering structures
 

Emission of dust  particles

Risk of air pollution
• Staff protection
• Regular maintenance of construction machines
• Wetting the roads
 

Movement  of machinery

• Soil erosion
• Degradation  of cultivation area
 

• Maintaining the construction machines in the right-of- way
• Surveillance and sensitization
 

Spilling of hydrocarbons

Water and soil contamination

Oil protection and collection mechanism (see environmental clauses)

Poor site signposting

• Traffic disruption
• Risks of accidents
 

Signposting and sensitization

Transportation of materials

Dust emissions
Drivers’ bad behaviour
 

• Risk of air pollution
• Risk of accidents
 

• Protection of vehicles
• Surveying the transportation of consignments
• Sensitizing drivers
 




Commissioning the highway

Physical barrier formed by the highway wall

Risk of flooding of districts located on the right bank of the road

Rainwater collection and draining structures along the highway

Physical interruption  and disruption  of the movement of persons and goods

Crossing structures (notably for access to schools, markets, shops, health  centres, etc. and for livestock)



Traffic increase
Sand build-up (silting up of the right-of-way)
 

Gas pollution and sound nuisance
Planting roadside trees all along
• Landscaping the back-up land
• Sound proof  structures/walls
• Noise pollution monitoring system

Risks of accidents
 
• Digging out the sand from the road network regularly
• Planting roadside trees all along
• Road safety campaigns
Sensitizing  populations of the neighborhood

Additional measures

Breaking-off effect

Difficult access to health centre

Construction Health Centre

 Toolbox 