Operators associated with the Project LOT 1 and LOT 2
Lot 1 Malick Sy – Patte d’Oie
- The grouping formed by the Senegalese company Jean Lefèvre and the Henan China Company of the People’s Republic of China secured the contract for Lot 1 of the first stretch.
- The DAR AL HANDASAH and BETEG firms are in charge of controlling the works on Lot 1 of the first stretch.
Lot 2 Patte d’Oie - Pikine
- The contract for lot 2 Patte d’Oie – Pikine was secured by the Portuguese firm MSF (Moniz da maia, Serra & Fortunato).
- The technical studies and the CAD were carried out by the Scet-Tunisia firm.
- The SCETAUROUTE / EGIS ROUTE firm is in charge of controlling the works on Lot 2.
- ICA RINCENT is the External Laboratory responsible for carrying out tests for the control team, while SSIC is the technical Control Office.
|
|